Wiring & Installation Guide
This guide is intended for qualified electricians performing the electrical installation of a Thorium EV charging controller. It covers electrical requirements, wiring topology, per-channel connections, and critical safety considerations.
Electrical Requirements
| Parameter | Requirement |
|---|---|
| Supply voltage | 230V AC (single-phase) or 400V AC (three-phase), 50Hz |
| Max current per channel | 32A |
| Cable size (single-phase, ≤32A) | 6mm² Cu minimum |
| Cable size (three-phase, ≤32A) | 6mm² Cu per phase minimum |
| MCB per channel | C-curve, rated to match charger (e.g., C32 for 32A charger) |
| RCD protection | Type A minimum (Type B recommended for DC-sensitive chargers) |
| Earth conductor | Continuous PE from distribution board through Thorium to charger |
| Controller supply | Separate 230V feed, 6A MCB, for the controller board (always-on) |
Wiring Topology
The overall power path for each channel follows this sequence:
Distribution Board
│
├— MCB (per channel) —→ RCD —→ Thorium Contactor —→ EV Charger
├— MCB (per channel) —→ RCD —→ Thorium Contactor —→ EV Charger
├— MCB (per channel) —→ RCD —→ Thorium Contactor —→ EV Charger
├— MCB (per channel) —→ RCD —→ Thorium Contactor —→ EV Charger
│
└— MCB (6A) —→ Thorium Controller Board (always-on 230V supply) Key points:
- Each charger channel has its own dedicated MCB and RCD in the distribution board.
- The Thorium unit interrupts the supply between the distribution board and the charger using its internal contactors.
- The controller board has a separate always-on supply so it can operate the touchscreen, POS terminal, and network connection regardless of whether any channel is active.
- The earth (PE) conductor passes straight through — it is never switched by the contactor.
Per-Channel Wiring
Inside the Thorium enclosure, each channel has a clearly labeled terminal block set:
Input Terminals (from distribution board)
L-IN— Line (live) input from the MCB/RCD.N-IN— Neutral input.PE-IN— Protective earth input.
Output Terminals (to charger)
L-OUT— Line (live) output to charger, switched by contactor.N-OUT— Neutral output to charger.PE-OUT— Protective earth output to charger (direct pass-through).
For three-phase channels, the terminal block extends to L1-IN, L2-IN, L3-IN on the input side and L1-OUT, L2-OUT, L3-OUT on the output side. All three phases are switched simultaneously by a 3-pole contactor.
Current Sensor Installation
- Open the split-core CT clamp by pressing the release tab.
- Clip it around the live conductor only (L for single-phase, or L1 for three-phase — one CT per channel).
- Ensure the arrow printed on the CT body points toward the charger (in the direction of current flow to the load).
- Close the clamp until it clicks. The two halves must be fully mated with no air gap.
- Plug the CT cable into the corresponding
CT1–CT4port on the controller board.
Network Connection
Ethernet
Connect a Cat5e or Cat6 Ethernet cable from your network switch or router to the ETH RJ45 port on the Thorium controller board. The unit supports 10/100 Mbps and will obtain an IP
address via DHCP by default.
4G LTE (Optional)
If wired Ethernet is not available, insert a compatible 4G USB dongle into the USB1 port on the controller board. The dongle must have an active SIM card with a data plan. Thorium
will detect the dongle on boot and use it as the primary network interface. Tested dongles include
the Huawei E3372 and ZTE MF833V.
Safety Notes
- Always isolate before working. Turn off all upstream MCBs and verify zero voltage with a multimeter before touching any terminal inside the Thorium enclosure.
- Torque terminal screws to specification. Under-tightened connections cause heat buildup and are a fire risk. Recommended torque: 1.2–1.5 Nm for the terminal blocks used.
- Do not exceed cable ratings. Ensure that cable cross-sections are appropriate for the installed MCB rating and cable run length. Consult voltage drop tables for runs exceeding 20 meters.
- Earth continuity is critical. Verify end-to-end PE continuity from the distribution board through Thorium to the charger. The PE conductor must never be interrupted by the contactor.
- Label everything. Clearly label each channel's cables at both the Thorium unit and the distribution board. This simplifies future maintenance and troubleshooting.
- Test after installation. After completing all wiring, perform insulation resistance testing, earth continuity testing, and a functional test of each channel before handing over to the operator.